Belwind Phase 1 Power Plant (Wind)

The Belwind Phase 1 plant is a Wind power plant located in 🇧🇪 Belgium. Belwind Phase 1 has a peak capacity of 171.0 MW which is generated by Wind. The power plant was commissioned in 2010 and started energy production the same year.

Generated Gigawatt Hours (2013-2019)

The data for generated gigawatt hours between 2013-2019 is incomplete.

Estimated Generated Gigawatt Hours (2013-2019)

Esitmated numbers might be available if no offical reccords has been released, or if they were added to the database before official numbers was recorded.

Other Wind Power Plants in Belgium

Name Capacity (MW Type Other Fuel Owner
Aspiravi Wuustwezel 22.1 MW Wind
Froidchapelle Wind 25.0 MW Wind
HERDERSBRUG WIND 3.0 MW Wind
Northwind 216.0 MW Wind
RODENHUIZE WIND 4.5 MW Wind
SCHELLE WIND 4.5 MW Wind
Thorntonbank - C-Power - Area NE 147.6 MW Wind
Thorntonbank - C-Power - Area SW 177.6 MW Wind
WM Park Powerport Zeebrugge 12.0 MW Wind
Windvision Estinnes WIND 80.0 MW Wind
ZEEBRUGGE WIND 12.0 MW Wind

Data Information

This data is a derivitive set of data gathered by source mentioned below.

Data Sources

Global Energy Observatory/Google/KTH Royal Institute of Technology in Stockholm/Enipedia/World Resources Institute/database.earth

Wind