Pantaleon Power Plant (Biomass)

The Pantaleon plant is a Biomass power plant located in 🇬🇹 Guatemala. Pantaleon has a peak capacity of 82.0 MW which is generated by Biomass. The power plant was commissioned in 1991 and started energy production the same year.

Generated Gigawatt Hours (2013-2019)

The data for generated gigawatt hours between 2013-2019 is incomplete.

Estimated Generated Gigawatt Hours (2013-2019)

Esitmated numbers might be available if no offical reccords has been released, or if they were added to the database before official numbers was recorded.

Other Biomass Power Plants in Guatemala

Name Capacity (MW Type Other Fuel Owner
Biomass 119.0 MW Biomass
Concepcion 27.5 MW Biomass
El Pilar 33.4 MW Biomass
Madre Tierra 28.0 MW Biomass
Magdalena 145.0 MW Biomass
Palo Gordo 76.9 MW Biomass
San Diego 5.0 MW Biomass
Trinidad 86.8 MW Biomass
Tulula 50.0 MW Biomass

Data Information

This data is a derivitive set of data gathered by source mentioned below.

Data Sources

Global Energy Observatory/Google/KTH Royal Institute of Technology in Stockholm/Enipedia/World Resources Institute/database.earth

Biomass