Toledo Ref Power Recovery Train Power Plant (Petcoke)

The Toledo Ref Power Recovery Train plant is a Petcoke power plant located in 🇺🇸 United States of America. Toledo Ref Power Recovery Train has a peak capacity of 6.0 MW which is mainly generated by Petcoke, while other fuels like Gas can be utilized. The power plant was commissioned in 1986 and started energy production the same year. The current owner and operator of the Toledo Ref Power Recovery Train facility is Toledo Refining Company.

Generated Gigawatt Hours (2013-2019)

The data for generated gigawatt hours between 2013-2019 is incomplete.

Estimated Generated Gigawatt Hours (2013-2019)

Esitmated numbers might be available if no offical reccords has been released, or if they were added to the database before official numbers was recorded.

Other Petcoke Power Plants in United States of America

Name Capacity (MW Type Other Fuel Owner
Alpena Cement Plant 47.2 MW Petcoke Coal, Other, Lafarge Corp
Brame Energy Center 1707.3 MW Petcoke Coal, Oil, Gas Cleco Power LLC
FirstEnergy Bay Shore 166.5 MW Petcoke Coal, Oil, Walleye Power LLC
Manitowoc 117.4 MW Petcoke Coal, Waste, Manitowoc Public Utilities
PRSI FCC Generator 4.7 MW Petcoke Pasadena Refining System Inc
Phillips 66 Carbon Plant 27.3 MW Petcoke Phillips 66 Company
Savannah River Mill 140.4 MW Petcoke Waste, Coal, Oil Georgia-Pacific Consr Prods LP-Savannah
Seadrift Coke LP 7.6 MW Petcoke Seadrift Coke L P
Valero Refinery Corpus Christi West 69.2 MW Petcoke Cogeneration, Gas, Valero Refining Co
Yellowstone Energy LP 68.0 MW Petcoke Gas, Yellowstone Energy LP

Data Information

This data is a derivitive set of data gathered by source mentioned below.

Data Sources

Global Energy Observatory/Google/KTH Royal Institute of Technology in Stockholm/Enipedia/World Resources Institute/database.earth

Petcoke